Discussion on key successful factors of TPM in enterprises
Main Article Content
Abstract
It generally takes 2.5 to 3 years for an enterprise to implement TPM in a full swing; however, the actual duration depends on each company’s corporate status. Generally speaking, for a company with big staff, it even takes 3 to 5 years, but the major consideration should depend on whether the actual benefit is remarkable or not. This research aims to find out whether total productive maintenance (TPM) was carried out by enterprises, to inspect the enterprises’ current performance, and to make comparison with those enterprises that have successfully carried out TPM. Through the findings, we hope to provide reference for enterprise owners when they carry out TPM, so as to reduce the cost for fumble. All Rights Reserved © 2015 Universidad Nacional Autónoma de México, Centro de Ciencias Aplicadas y Desarrollo Tecnológico. This is an open access item distributed under the Creative Commons CC License BY-NC-ND 4.0.
Article Details
How to Cite
Shen, C.-C. (2015). Discussion on key successful factors of TPM in enterprises. Journal of Applied Research and Technology, 13(3). https://doi.org/10.1016/j.jart.2015.05.002
Issue
Section
Articles