Patil, A. S., Pisal, M. V. and Suryavanshi, C. T. (2021) “Application of value stream mapping to enhance productivity by reducing manufacturing lead time in a manufacturing company: A case study”, Journal of Applied Research and Technology, 19(1), pp. 11–22. doi: 10.22201/icat.24486736e.2021.19.1.1488.