[1]
Chiu, S., Tseng, C.-T., Wu, M.-F. and Sung, P.-C. 2014. Multi-Item EPQ Model with Scrap, Rework and Multi-Delivery using Common Cycle Policy. Journal of Applied Research and Technology. 12, 3 (Jun. 2014). DOI:https://doi.org/10.1016/S1665-6423(14)71641-4.