[1]
Molavi, M., Hamzeli, H. and Dalfard, V. 2014. Multi-Objective Lead-Time Control Problem with Stochastic Constraints. Journal of Applied Research and Technology. 12, 5 (Oct. 2014). DOI:https://doi.org/10.1016/S1665-6423(14)70599-1.